The process of seal coating asphalt protects your pavement and dramatically improves the overall appearance of your driveway or parking lot. We will use the following steps to insure that the asphalt seal coating process is completed properly.
1. BLOCK – We block off the designated area first to prepare the space for seal coating. Our team will also make sure that all automated sprinkler systems are turned off until 24 hours after the work has been completed.
2. CLEAN – Cleaning the entire area from debris is very important for the sealant to bond correctly with the existing asphalt. We use blowers, brooms and brushes to eliminate all the debris from the area.
3. PRIME – After a careful evaluation of the pavement’s condition, our crew will cover any oil and chemical spots with primer.
4. FILL IN – Once the pavement has been primed, we fill in all the cracks with our quality crack sealant. Our experienced staff will also repair any asphalt defects at this time.
5. SEAL – Now that the entire area has been completely prepped, we apply at least two coats of a high-quality commercial grade sealer. The seal coating will need to dry for at least 12 hours.
6. RESTRIPE – When the seal coating has dried, we will restripe the parking lot and repaint any specific pavement markings that you’ve requested.
7. OPEN – Before we open the parking lot or driveway to traffic again, we will do a thorough walk-through with you to make sure you’re completely satisfied.
At Alpha Paving Industries LLC, we are known for our professional work and exceptional customer service. As an award-winning paving and pavement maintenance contractor in the greater Austin area, you can be confident that your project will be completed with the utmost care. Contact us today at 512-677-9001 or complete the “Free Job Quote” form for additional information!